On Saturday we really struggled to get through the area where Grimshaw Lane Aqueduct had just recently been repaired. We were dragging the bottom and bouncing over debris before coming to a halt with a bladeful of rubbish & grounded mid channel. We where about 1/4 mile from the nearest bridge so spent 1/2 an hour moving coal to lift the stern and another 1/2 an hour crawling to the next bridge. After some some time on the shaft Brian managed to remove a large quantity of hessian sacking from the blades. Aghh the joys of boating!
Sent using BlackBerry® from Orange
Monday, April 12, 2010
Subscribe to:
Posts (Atom)